Bulgaria Terasol 110 MW Solar Park
Aperçu du projet
Type de projet
Centrale au sol
Lieu du projet
Municipality of Hristeni, Region Stara Zagora, Bulgaria
Capacité installée
110 MW
Type de module
ASTRO 5 (550W)
Propriétaire du projet
C Solar energy
CO₂ évité
119,739 tons average annual
Production d’énergie électrique
148,744 MWh average annual
Date de branchement au réseau
June 6th, 2023
Caractéristiques du projet
Bulgaria Terasol 110 MW Solar Park, occupying 120 hectares in the village of Hrishteni near Stara Zagora, is equipped with 218,240 ASTRO 5 modules with a unit capacity of 550W. Owned by C Solar energy, the project is booming solar development in Bulgarian market, which allows the supply of green electricity to end users and changes the proportion of local energy sources. The MBB design of the ASTRO 5 modules and the 25-year linear power warranty ensure long-term stable solar power generation from the project, which is expected to generate an average of 148,744 MWh per year, offsetting an average of 119,739 tons per year.