Midden Groningen 103 MW Solar Park in the Netherlands

Aperçu du projet

Type de projet

Centrale au sol

Lieu du projet

Hoogezand-Sappemeer, the Netherlands

Capacité installée

103 MWp

Date de branchement au réseau

The construction of Midden Groningen Solar Park began in early 2019, and was connected to grid on 10th December, 2019.

Propriétaire du projet

Blue Elephant Energy

Production d’énergie électrique

97,850 MWh First-Year

Type de module

ASTRO Module (325Wp)

Caractéristiques du projet

One of the largest power stations, Midden Groningen 103 MW Solar Park was the first to be integrated into the TenneT State grid in the Netherlands, which was successfully connected to the grid in December 2019. As a kind of mainstream product of mass production in 2019, 315,000 high cost-performance ASTRO modules (325Wp) were installed on 117 hectares of land, have effectively increased the project power generation.