Midden Groningen 103 MW Solar Park in the Netherlands
Aperçu du projet
Type de projet
Centrale au sol
Lieu du projet
Hoogezand-Sappemeer, the Netherlands
Capacité installée
103 MWp
Date de branchement au réseau
The construction of Midden Groningen Solar Park began in early 2019, and was connected to grid on 10th December, 2019.
Propriétaire du projet
Blue Elephant Energy
Production d’énergie électrique
97,850 MWh First-Year
Type de module
ASTRO Module (325Wp)
Caractéristiques du projet
One of the largest power stations, Midden Groningen 103 MW Solar Park was the first to be integrated into the TenneT State grid in the Netherlands, which was successfully connected to the grid in December 2019. As a kind of mainstream product of mass production in 2019, 315,000 high cost-performance ASTRO modules (325Wp) were installed on 117 hectares of land, have effectively increased the project power generation.