Lutai 200MW Solar Park

Aperçu du projet

Type de projet

Gobi Solar Park

Lieu du projet

Aksay Kazak, Gansu Province, China

Capacité installée

200 MW

Type de module

ASTRO 6 Monofacial Module (670W)

Propriétaire du projet

CHINT

CO₂ évité

414,515 tons average annual

Production d’énergie électrique

416 million kWh average annual

Date de branchement au réseau

On September 26, 2021, the project was constructed and was connected to the grid on September 30, 2022.

Caractéristiques du projet

Tutai 200MW Solar Park installed a total of 384,636 ASTRO 6 modules with core strengths of high power, high efficiency, high quality, low voltage, high string power, and low BOS and LCOE. As the video shows, the project is shaped as a topographic map of China’s Gansu Province, building a Green Silk Road in the Gobi Desert.
This is the fourth PV project constructed by CHINT at Aksay, making the total installed capacity of local CHINT-constructed plants hit 294MW. On the same day that the Lutai project started to generate electricity, the fifth CHINT-constructed project at Aksay – Yintai 100 MW PV project – was announced to start construction.