Brazil Sertão 117 MW Solar Park
Aperçu du projet
Type de projet
Centrale au sol
Lieu du projet
Barreiras, Bahia, Brazil
Capacité installée
117 MW
Type de module
ASTRO Module (330W)
Propriétaire du projet
Actis Group
CO₂ évité
34,000 tons average annual
Production d’énergie électrique
275 GWh average annual
Date de branchement au réseau
December 2019
Caractéristiques du projet
Brazil Sertão 117 MW Solar Park, located in Bahia, is equipped with 349,253 modules. Astronergy has provided 48 MW ASTRO modules for the project. Through a 20-year power purchase agreement (PPA) issued by government, the solar park will generate 275 GWh of electricity to meet the demand of 145,000 families and reduce the carbon dioxide emissions by more than 34,000 tons. This large-scale project is expected to contribute to the growing renewable energy market in Latin America. According to a report by T&B Petroleum (August 2022), Bahia continues to be the protagonist of renewable energy in Brazil and leads the country in solar power generation (30.30%). Currently, the state has 41 solar park in operation with an installed solar capacity of 1,349 MW.